Piling&ConcreteWraps

Vinyl and concrete piling wraps that stop marine borers and extend piling lifespan by decades. Serving St. Petersburg and the greater Tampa Bay area.

§ The work

Marine borers eat wood pilings from the tideline down, and the damage is invisible from the dock until something gives. Wrapping seals the piling off from oxygen and borers and stops the decay.

I install vinyl wraps and concrete jackets on damaged and healthy pilings alike — far cheaper than replacing a piling, and it buys decades.

§ What's included

  • Underwater piling condition inspection
  • Vinyl wrap installation with stainless banding
  • Concrete jacket / pile encapsulation
  • Coverage from below the mudline up past the tideline

§ Common questions

Piling & Concrete Wraps — answered.

How long do piling wraps last?

A properly installed vinyl wrap or concrete jacket typically protects a piling for 20 years or more and costs a fraction of replacing it.

Can damaged pilings still be wrapped?

Often yes. If the core is still structurally sound, a concrete jacket can restore strength and stop further borer damage.

§ Where I work

Piling & Concrete Wraps is available throughout Pinellas and Hillsborough County, including St. Petersburg, Gulfport, Tierra Verde, St. Pete Beach, Treasure Island, Madeira Beach, Clearwater, Tampa, Apollo Beach, Safety Harbor, and the marinas in between.

Ready for piling & concrete wraps?

Request a Quote →